community
Mexico City Metro Suspends Cablebús Lines 1-3 for Two-Week Maintenance
Annual maintenance for Cablebús lines 1-3 is scheduled from July 13-26, with free RTP support routes operating during station closures.
How we reported this
Annual maintenance for Cablebús lines 1-3 in Mexico City is scheduled from July 13-26, 2026, according to a report. Stations will be closed during this period, but the RTP (public transportation network) will operate free support routes.
The maintenance was reported alongside other local news items about transport and infrastructure.
Sources: perplexity-sonar.